PROJECT: Kingsford Smith Drive upgrade, Brisbane
TIME PERIOD: 2020
EQUIPMENT SUPPLIED:
- Over 3 kilometres of concrete crash barriers
- Multiple excavators ranging from 5.5t to 22t
- Posi-track loaders
- Road Plates
- Water Filled Barriers
About the project
Kingsford Smith Drive is a major Brisbane arterial road linking the CBD to the Airport, Port of Brisbane and other key precincts. Brisbane City Council Read more


