Case Studies

Safe and Reliable Equipment for Canberra’s Metro Light Rail

Project: Canberra Metro Light Rail

PROJECT: Canberra Metro Light Rail

TIME PERIOD: 2016 – Ongoing

EQUIPMENT SUPPLIED: 

About the project: 

Canberra Metro Construction is a joint venture between John Holland and CPB Contractors, tasked with delivering the iconic Canberra Metro Light Rail project. The Read more

A Complete Hire Solution for Parramatta Light Rail

Project: Hire Equipment for Parramatta Light Rail

TIME PERIOD: Ongoing

EQUIPMENT SUPPLIED:

  • Excavators ranging from 5.5 to 13 tonne
  • Concrete barriers
  • Water filled barriers
  • Temporary fencing
  • Steel plates

 

About the project:

Designed to be operational by 2023, Parramatta Light Rail will prepare Western Sydney for strong growth in the coming years. With an estimated 130,000 people living within walking Read more

Case Study: Reliable Protection for Melbourne’s AAMI Park Stadium

Project: Security Measures for AAMI Park Stadium

TIME PERIOD:  2017 – Ongoing

EQUIPMENT SUPPLIED: 

  • 450m of Deltabloc crash rated concrete barriers fitted with 8 x 60km Arbsorb350 end terminals
  • 320m of Armorzone water-filled barriers


About the project:

AAMI Park Stadium is one of Melbourne’s premier sporting and event locations and is unique in that it is Melbourne’s only rectangular stadium. Read more