Case Studies

Orange Hire Partners with Cross River Rail

PROJECT: Cross River Rail, Queensland

TIME PERIOD: Ongoing

EQUIPMENT SUPPLIED:

 

About the Project:

The Cross River Rail is a new 10km rail line stretching from Dutton Park to Bowen Hills, which includes nearly 6km of twin tunnels under the Brisbane River and its CBD. The project includes the construction of four Read more

Hire Solutions for Major Brisbane Road Project

PROJECT: Kingsford Smith Drive upgrade, Brisbane

TIME PERIOD: 2020

EQUIPMENT SUPPLIED:

  • Over 3 kilometres of concrete crash barriers
  • Multiple excavators ranging from 5.5t to 22t
  • Posi-track loaders
  • Road Plates
  • Water Filled Barriers

About the project

Kingsford Smith Drive is a major Brisbane arterial road linking the CBD to the Airport, Port of Brisbane and other key precincts. Brisbane City Council Read more